Design documentation of a steel receiver.
In mid-2018, ALLCONS Industry was approached by a long-time customer about designing a steel receiver that is part of the aforementioned solar Power plant. This Power plant is part of the solar park at Mohammed bin Rashid Al Maktoum, located 50 kilometres from the capital of the United Arab Emirates Dubai. The capacity of the CSP Tower alone is estimated at 100 MW. The scope of the contract included complete structural analysis, connections and verification during assembly, moving the receiver and lifting the receiver to the top of the concrete pedestal.