Design documentation, fabrication and assembly of steel structures of dedusting system

Description

The aim of the project was a complete supply of two bag filters for the filtration of fumes flowing from the sintering furnaces of the South agglomeration. The filters included clean and row gas ducts, fans, conveyors and tanks. The total weight of the delivered steel structures was 950 tons.

  • Design documentation including structural analyses: building permit design documentation, detailed design documentation, workshop documentation, as-built documentation
  • Fabrication and assembly of steel structures: filters, de-dusting ducts, silencers, CaCO3 and fly ash silos
  • Installation of filter bags, conveyors (pneumatic transport) and pressure air distribution systems
  • Insulation of filters and dedusting ducts
Year of implementation
03/2015 – 11/2015
Locality
ArcelorMittal Ostrava, Czech Republic
> 30 years successful on the market
> 30 years
successful on the market
> 50 countries, where to find our work
> 50 countries,
where to find our work
Certificates for all production
Certificates
for all production
Comprehensive services from design to assembly
Comprehensive services
from design to assembly
Top