Technical supervision during the construction of hydroelectric power plant in Georgia

Description

The subject of the contract was technical supervision and technical assistance in the implementation of the hydromechanical part of steel structures during the construction of a hydroelectric power plant with an output of 53 MW. The hydroelectric power plant is located on the Mtkvari River near Akhaltsikhe in Georgia. Activities carried out:

  • Setting up procedures to ensure the quality of work of the steel structure supplier
  • Technical supervision of steel structure construction, related inspections and tests
  • Technical support and initiation of corrective actions
  • Deadline checks, regular reports, etc.

Hydromechanical parts of steel structures:

  • Closers, Slides, flaps, gates and their components such as storage thresholds, guide rails, etc.
  • Crane runways, bridge cranes and other lifting equipment
  • Steel parts of the engine room: pressure hatches, pressure doors, ...
  • Supply and discharge pipes, guide plates
Year of implementation
01/2018 – 05/2018
Locality
Akhaltsikhe, Georgia
> 30 years successful on the market
> 30 years
successful on the market
> 50 countries, where to find our work
> 50 countries,
where to find our work
Certificates for all production
Certificates
for all production
Comprehensive services from design to assembly
Comprehensive services
from design to assembly
Top