The subject of the design was the complete supply of the silo of incompletely slaked lime from FMR furnaces, including modifications and reinforcement of the existing supporting structure. The work consisted of:
The key point of the whole project was the assembly itself. Since the assembly took place in the rainy winter season and the only acceptable method of installation was through the roof and therefore it was necessary to open it, the assembly had to be very carefully planned and had to take place very quickly, because no rainwater was allowed to enter the production shop due to the dusty environment.