After the reconstruction of the building, an inspection of the steel structures of the ABS1 absorber body, the ABS1 steel supporting structure, the steel structure of the gypsum dehydration unit building, the power bridge and the adjacent service platforms and ladders in the Detmarovice power plant were inspected. The inspections were carried out as initial ones according to ČSN 73 2604. Found defects were recorded, their repair and deadline for making good were proposed. At the same time, defects were defined that prevented the device from being put into use. In particular, the following activities were audited: