Initial inspections of steel structures of the absorber in the Power Plant

Description

After the reconstruction of the building, an inspection of the steel structures of the  ABS1 absorber body, the ABS1 steel supporting structure, the steel structure of the gypsum dehydration unit building, the power bridge and the adjacent service platforms and ladders in the Detmarovice power plant were inspected.  The inspections were carried out as initial ones according to ČSN 73 2604. Found defects were recorded, their repair and deadline for making good were proposed. At the same time, defects were defined that prevented the device from being put into use. In particular, the following activities were audited:

  • Conformity of design documentation with the condition installed
  • Workmanship of details – anchoring, bolted and welded joints
  • Tightening of bolted joints
  • Deformation of the structure after assembly
  • Workmanship of corrosion protection
  • Meeting safety requirements – ČSN EN ISO 14122-(1-4)
Year of implementation
05/2021
Locality
Detmarovice Power Plant, Czech Republic
> 30 years successful on the market
> 30 years
successful on the market
> 50 countries, where to find our work
> 50 countries,
where to find our work
Certificates for all production
Certificates
for all production
Comprehensive services from design to assembly
Comprehensive services
from design to assembly
Top